Publications

Export 72 results:
Author [ Title(Desc)] Type Year
Filters: First Letter Of Title is C  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
C
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. CA ISO Real Time Voltage Security Assessment (VSA) Project: Summary of Survey Result on Methodologies for use in Real Time Voltage Security Assessment. 2005.
Solutions, Consortium for Electr. CAISO-CERTS Synchronized Phasor Measurements Applications User Guide. 2002.
Stadler, Michael, and Timothy E Lipman. "California CHP Greenhouse Gas Abatement: Contribution of Medium-Sized Commercial Buildings." 2009.
Gerke, Brian F, Giulia Gallo, Sarah Josephine Smith, Jingjing Liu, Shuba V Raghavan, Peter Schwartz, Mary Ann Piette, Rongxin Yin, and Sofia Stensson. The California Demand Response Potential Study, Phase 3: Final Report on the Shift Resource through 2030. 2020.
Lewis, Glen, Ivin Rhyne, and Barbara A Atkinson. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report. 2009. LBNL-2585E.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Project: Summary of Survey Results on Methodologies for use in Real-Time Voltage Security Assessment (Real-Time Grid Reliability Management PIER Final Project Report Appendix A). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
Budhraja, Vikram S, Fred Mobasheri, Margaret Cheng, Jim Dyer, Eduyng Castaño, and Stephen Hess. California’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios. CERTS, 2003.
Eto, Joseph H, and John P Stovall. California's Electricity System of the Future: Scenario Analysis in Support of Public-Interest Transmission System R&D Planning. 2003. LBNL-52047.
Ragwitz, Mario, Anselm Brakhage, Lukas Kranzl, Michael Stadler, Claus Huber, Reinhard Haas, Elena Tsioliaridou, Jacky Pett, Pedro Gürtler, Kaj Joergensen, Arkadiusz Figorski, Adam Gula, Elzbieta Gula, Beata Sliz, and Artur Wyrwa. "Case Studies, Work Package 6 of INVERT." 2005.
Weller, G.H. A Case Study Review of Technical and Technological Issues for Transition of a Utility Load Management Program to Provide System Reliability Resources in Restructured Electricity Markets. 2001.
Group, Electric Power. CERTS Area Control Error (ACE) - Frequency Real-Time Monitoring System. 2002.
Rubio, F. Javier, Afzal S Siddiqui, Chris Marnay, and Kristina Hamachi LaCommare. CERTS Customer Adoption Model. Berkeley: Lawrence Berkeley National Laboratory, 2001. LBNL-47772.
Marnay, Chris, Afzal S Siddiqui, Jeremy V Guttenplan, and Mark Khavkin. CERTS Database Brochure. Berkeley: LBNL, 2000.
CERTS Grid of the Future White Papers. 1999.
Marnay, Chris, and Owen C Bailey. "The CERTS Microgrid and the Future of the Macrogrid." ACEEE Summer Study on Energy Efficiency in Buildings. Berkeley: LBNL, 2004. 14. LBNL-55281.
Lasseter, Robert H, Joseph H Eto, Ben Schenkman, John Stevens, Harry T Volkommer, David Klapp, Ed Linton, Hector Hurtado, and Joyashree Roy. "CERTS Microgrid Laboratory Test Bed." IEEE Transactions on Power Delivery 26.1 (2011). LBNL-3553E .
Eto, Joseph H, Robert H Lasseter, Ben Schenkman, John Stevens, Harry T Volkommer, David Klapp, Ed Linton, Hector Hurtado, Jean Roy, and Nancy J Lewis. CERTS Microgrid Laboratory Test Bed (California Energy Commission Public Interest Energy Research (PIER) Program Final Report. 2009.
Klapp, David, R. Zimmerly, and J. Howard. CERTS Microgrid Mechanical Switch Test Report. 2011.
Solutions, Consortium for Electr. CERTS Microgrid Phase Two Results. 2009.
Solutions, Consortium for Electr. CERTS Microgrid Phase Two Test Report. 2010.
Khalsa, Amrit S, and Surya Baktiono. CERTS Microgrid Test Bed Battery Energy Storage System Report: Phase 1. 2016.
Eto, Joseph H. "CERTS Microgrid Test Bed Phase III Activities." 2011.

Pages