Publications
"Benefits and costs of improved IEQ in offices." Indoor Air 21.3 (2011) 357–367. LBNL-4827E.
. "Benefits and costs of increasing ventilation rates in U.S. offices." Proceedings of Indoor Air 2011, a219 2. Austin, TX, 2011.
. "Benefits and costs of increasing ventilation rates in U.S. offices." Proceedings of Indoor Air 2011, a219 2. Austin, TX, 2011.
. . "Beyond the Price Effect in Time-of-Use Programs: Results from a Municipal Utility Pilot, 2007-2008." International Energy Program Evaluation Conference 2009. Portland, OR, 2009. LBNL-2750e.
. "Bottom-up energy supply optimization of a national building stock." Energy and Buildings 209 (2020) 109667.
. "Building Distributed Energy Performance Optimization for China - a Regional Analysis of Building Energy Costs and CO2 Emissions." 2012 ACEEE Summer Study on Energy Efficiency in Buildings, August 12-17, 2012 2012. LBNL-81770.
. Building Electric Transmission Lines: A Review of Recent Regional Transmission Plans. 2016. LBNL-1006331.
. Building Electric Transmission Lines: A Review of Recent Transmission Projects. 2016. LBNL-1006330.
. "Building Scale DC Microgrids." 2012 IEEE Energytech 2012. LBNL-5729E.
. "A Buildings Module for the Stochastic Energy Deployment System." ACEEE 2008 Summer Study on Energy Efficiency in Buildings 2008. LBNL-291E.
. A Business Case for On-Site Generation: The BD Biosciences Pharmingen Project. Berkeley: Lawrence Berkeley National Laboratory, 2003. LBNL-52759.
. . . . .
California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report. 2009. LBNL-2585E.
. California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
. . California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
. California’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios. CERTS, 2003.
. . .